FICTIONAL BASELINE SOURCE
D-workspace | internal | 2026-10-28

ATS snapshot is current to October 28 09:00Z. Calendar connector returned 503 at 09:05Z; attachment CAL-17 is unavailable. A missing attachment does not mean a cancelled meeting. Task T01: Mira to compare location costs, due October 28, open. Task T02: U01 to confirm compensation approval, due October 30, open. Show the source status beside the workspace summary.